Other

Furnace oil

Furnace oil held on site. Roughly 6,000 Mton of the original 13,000 has already gone. This is a fuel lot, not a metal lot, and is quoted, lifted and documented separately — its quantity is not included in the site's metal tonnage total.

Awaiting images — photographs of this lot have not been supplied yet. Ask the desk and we will request them from site.

Available now
7,000 Mton
Original quantity
13,000 Mton
Sold to date
6,000 Mton
Indicative value
$3.4M

54% still available · 6,000 Mton sold

Enquire about this lot

Indicative value converts the seller's schedule at PKR 280 to the dollar and includes a 8% trading margin. It is not a quotation. Firm price follows inspection and weighing.

Lot detail

Specification.

Specification and quantity detail for Furnace oil
Material categoryOther
Schedule lineFurnace oil
Original quantity13,000 Mton
Sold to date6,000 Mton
Available now7,000 Mton
SourceDecommissioned 220 MW thermal power station
LocationConfirmed on enquiry
Load portConfirmed on enquiry
TermsEXW / FOB — subject to lot and buyer's nomination
InspectionBuyer inspection and independent weighing available by arrangement

Next steps

How this lot is bought.

  1. 01

    Say what you need

    Whole lot or part — 7,000 Mton is available and it can be split. Several lots can be combined into one shipment.

  2. 02

    Inspect and weigh

    Buyer inspection and independent weighing available by arrangement. Nothing is priced firm until the material has been seen and weighed.

  3. 03

    Fix terms and lift

    Terms are agreed lot by lot — exw / fob — subject to lot and buyer's nomination. Payment and lifting schedule are set at contract.

Enquire about furnace oil.

Send the tonnage you want and the desk will come back with a firm position.