
Available stock.
One decommissioned 220 MW thermal power station, offered lot by lot. Every tonnage below is the seller's own schedule figure — what was there, what has gone, and what is still available today.
- Lots available
- 13
- Metal tonnage available
- 51,845 t
- Indicative total value
- $52.5M
- Schedule dated
- August 2026

Provenance
One station, stripped lot by lot.
Every lot on this page comes from the same decommissioned 220 MW thermal power station — the boilers, the turbine hall, the switchyard and the structure around them. Lots can be combined into a single shipment.
The lots
Browse by material.
Filter to the metal you buy, or sort by value to see where the weight sits. Every card shows what is still available and what has already been sold.
FerrousMild steel structure
The station's structural steelwork — the single largest lot on the schedule by weight.
Available
29,000t
Indicative
$15.4M
1,000 t sold of 30,000 t
CopperCopper — generator windings, rotor and stator
Armature windings, rotor copper and stator bars recovered from the station's generating sets.
Available
1,000t
Indicative
$11.6M
200 t sold of 1,200 t
FerrousFull lotBoilers — 220 MW, two units
Two 220 MW boiler units, untouched. Nothing has been taken off this line.
Available
15,000t
Indicative
$7.7M
Complete lot — 15,000 t
Plant & equipmentFull lotTurbines and condensers — Inconel-bladed, 220 MW
220 MW turbine rotors with Inconel blading, plus condensers. Complete — nothing sold.
Available
800t
Indicative
$5.4M
Complete lot — 800 t
- OtherAwaiting images
Furnace oil
7,000 Mton of furnace oil remaining from an original 13,000. Sold separately from the metal lots.
Available
7,000Mton
Indicative
$3.4M
6,000 Mton sold of 13,000 Mton
- Non-ferrousFull lot · Awaiting images
Electrical panels and switchgear
Switchgear, control and distribution panels across the station. Complete lot.
Available
1,300t
Indicative
$2.3M
Complete lot — 1,300 t
Plant & equipmentTransformers — 220 MW, three units
Three 220 MW transformers standing in the outdoor compound with bushings intact.
Available
950t
Indicative
$2.0M
250 t sold of 1,200 t
- CopperFull lot · Awaiting images
Electric motors
Station auxiliary drive motors. Complete lot — nothing sold to date.
Available
1,200t
Indicative
$1.9M
Complete lot — 1,200 t
Plant & equipmentGenerators — three units
Three generating sets, one already opened. Stator frames, casings and end shields.
Available
845t
Indicative
$1.2M
305 t sold of 1,150 t
- Non-ferrousFull lot · Awaiting images
Aluminium
Station aluminium. Complete lot, nothing sold.
Available
400t
Indicative
$810k
Complete lot — 400 t
Non-ferrousFull lotStainless steel
Cut stainless plate, stacked and ready. Complete lot.
Available
350t
Indicative
$490k
Complete lot — 350 t
- OtherFull lot · Awaiting images
Other materials
Mixed balance of station materials. Complete lot.
Available
1,000t
Indicative
$328k
Complete lot — 1,000 t
- OtherAwaiting images
Lubricating and transformer oils
100 tonnes remaining of an original 400. Largely sold.
Available
100t
Indicative
$46k
300 t sold of 400 t
Full schedule
The whole position, one table.
Original quantity, quantity sold, quantity remaining and indicative dollar value for all 13 lots — including the fuel and oil lines, which are traded separately from the metal.
| Lot | Original | Sold | Available | Indicative USD |
|---|---|---|---|---|
| Copper — generator windings, rotor and statorCopper | 1,200 t | 200 t | 1,000 t | $11,571,429 |
| Mild steel structureFerrous | 30,000 t | 1,000 t | 29,000 t | $15,428,571 |
| Boilers — 220 MW, two unitsFerrous | 15,000 t | — | 15,000 t | $7,714,286 |
| Turbines and condensers — Inconel-bladed, 220 MWPlant & equipment | 800 t | — | 800 t | $5,400,000 |
| Electrical panels and switchgearNon-ferrous | 1,300 t | — | 1,300 t | $2,256,429 |
| Transformers — 220 MW, three unitsPlant & equipment | 1,200 t | 250 t | 950 t | $2,044,286 |
| Electric motorsCopper | 1,200 t | — | 1,200 t | $1,851,429 |
| Generators — three unitsPlant & equipment | 1,150 t | 305 t | 845 t | $1,157,143 |
| AluminiumNon-ferrous | 400 t | — | 400 t | $810,000 |
| Stainless steelNon-ferrous | 350 t | — | 350 t | $489,857 |
| Other materialsOther | 1,000 t | — | 1,000 t | $327,857 |
| Furnace oilOther | 13,000 Mton | 6,000 Mton | 7,000 Mton | $3,402,000 |
| Lubricating and transformer oilsOther | 400 t | 300 t | 100 t | $46,286 |
| Total position | $52,499,571 | |||
Quantities are the seller's own schedule figures, dated August 2026. Dollar values are indicative only: they convert the schedule valuation at PKR 280 to the dollar and include Bergent's 8% trading margin. They are not a quotation, are not binding, and move with the exchange rate and with metal prices at the date of sale. Final price follows inspection and weighing.
How the sale works
Inspection first, price second.
01
Tell us the lot
Send the lot and the tonnage you want. Lots can be taken whole or in part, and several lots can be combined into one shipment.
02
Inspect and weigh
Buyer inspection and independent weighing available by arrangement. Nothing is priced firm until the material has been seen and weighed.
03
Fix terms and lift
Terms are agreed lot by lot — exw / fob — subject to lot and buyer's nomination. Payment and lifting schedule are set at contract.
Which lot do you want?
Send the lot and tonnage and the desk will come back with a firm position.