220 MW steam turbine rotor withdrawn onto timber bearers with its blade discs intact

220 MW steam turbine rotor withdrawn onto timber bearers with its blade discs intact

Plant & equipment

Turbines and condensers — Inconel-bladed, 220 MW

220 MW steam turbine rotors with their blade discs, described on the seller's schedule as Inconel-bladed, together with the condensers. The rotors have been withdrawn and are lying accessible in the turbine hall. High-nickel turbine blading is the reason this lot carries the second-highest valuation per tonne on the schedule; alloy grade is subject to independent verification and is not warranted by Bergent.

Available now
800 t
Original quantity
800 t
Sold to date
Indicative value
$5.4M

Complete lot — all 800 t available

Enquire about this lot

Indicative value converts the seller's schedule at PKR 280 to the dollar and includes a 8% trading margin. It is not a quotation. Firm price follows inspection and weighing.

Condition

Observed on site.

Recorded from the seller's own photographs and schedule in August 2026. Nothing here is inferred.

  • Turbine rotor withdrawn and set on timber bearers, blade discs intact along the full length
  • Second rotor with stainless blade discs sighted alongside the HP turbine bay
  • Alloy described as Inconel on the seller's schedule — not independently verified
Mixed industrial electrical equipment including transformers, alternators, and generator units staged for container export

The material

Industrial Scrap

Transformers, alternators, generators and heavy equipment.

  • Copper winding and core recovery from transformers and generators
  • Ferrous chassis and structural metal recovery for steel mills
  • Aluminium casing and component recovery

Lot detail

Specification.

Specification and quantity detail for Turbines and condensers — Inconel-bladed, 220 MW
Material categoryPlant & equipment
Schedule lineTurbine and condenser
Original quantity800 t
Sold to dateNone — full lot available
Available now800 t
SourceDecommissioned 220 MW thermal power station
LocationConfirmed on enquiry
Load portConfirmed on enquiry
TermsEXW / FOB — subject to lot and buyer's nomination
InspectionBuyer inspection and independent weighing available by arrangement

Next steps

How this lot is bought.

  1. 01

    Say what you need

    Whole lot or part — 800 t is available and it can be split. Several lots can be combined into one shipment.

  2. 02

    Inspect and weigh

    Buyer inspection and independent weighing available by arrangement. Nothing is priced firm until the material has been seen and weighed.

  3. 03

    Fix terms and lift

    Terms are agreed lot by lot — exw / fob — subject to lot and buyer's nomination. Payment and lifting schedule are set at contract.

Enquire about turbine and condenser.

Send the tonnage you want and the desk will come back with a firm position.