220 MW boiler unit seen from ground level within its multi-storey steel support structure

220 MW boiler unit seen from ground level within its multi-storey steel support structure

Ferrous

Boilers — 220 MW, two units

Two 220 MW boilers, complete and unstripped — the schedule shows the full estimated quantity still remaining. Pressure parts, water walls, economiser and air heater banks are in situ within the boiler house structure.

Available now
15,000 t
Original quantity
15,000 t
Sold to date
Indicative value
$7.7M

Complete lot — all 15,000 t available

Enquire about this lot

Indicative value converts the seller's schedule at PKR 280 to the dollar and includes a 8% trading margin. It is not a quotation. Firm price follows inspection and weighing.

Condition

Observed on site.

Recorded from the seller's own photographs and schedule in August 2026. Nothing here is inferred.

  • Two 220 MW boiler units identified on site
  • Full estimated quantity still shown as remaining on the seller's schedule
HMS 1 and HMS 2 baled ferrous scrap bundles stacked at an origin processing yard, prepared for container loading

The material

Ferrous Scrap

HMS, shredded, plate and structural in bulk or container.

  • Electric arc furnace steelmaking for rebar, wire rod, and structural steel
  • Foundry cupola furnace charge for cast iron production
  • Direct reduction iron (DRI) feedstock for mini-mills

Lot detail

Specification.

Specification and quantity detail for Boilers — 220 MW, two units
Material categoryFerrous
Schedule lineBoiler
Original quantity15,000 t
Sold to dateNone — full lot available
Available now15,000 t
SourceDecommissioned 220 MW thermal power station
LocationConfirmed on enquiry
Load portConfirmed on enquiry
TermsEXW / FOB — subject to lot and buyer's nomination
InspectionBuyer inspection and independent weighing available by arrangement

Next steps

How this lot is bought.

  1. 01

    Say what you need

    Whole lot or part — 15,000 t is available and it can be split. Several lots can be combined into one shipment.

  2. 02

    Inspect and weigh

    Buyer inspection and independent weighing available by arrangement. Nothing is priced firm until the material has been seen and weighed.

  3. 03

    Fix terms and lift

    Terms are agreed lot by lot — exw / fob — subject to lot and buyer's nomination. Payment and lifting schedule are set at contract.

Enquire about boiler.

Send the tonnage you want and the desk will come back with a firm position.